Popular Tags

1 Blog found.
  • Mar 03 2026

    3 minutes, 35 seconds
    2489 0 0 0 0/5

    After the residents were moved from the collapsed areas, the City’s appointed emergency contractor moved on site at the two major collapse points in Khayelitsha’s SST section and Makhaza, where preparatory work is under way ahead of the two-point repairs to the 700mm bulk sewer line. This includes i...